ENVIRONMENTAL PROTECTION FACILITIES

 

A. WASTE WATER CLEANING

  • industrial treatment plants
  • municipal treatment plants

 

          
               Waste Water Treatment Plant
,
                       Pig farm Podgrad
 

  

B. AIR CLEANING

  • desulphurization plant
  • dedusting facilities
  • electric parcipators

Waste Water Treatment Plant Laško


 

        Assembling of mechanical 
      and technological equipment, 
   Waste Water Treatment Plant Celje





      Device for desulphurization of  
smoke gases on Thermal plant Trbovlje

 

MAJOR PROJECTS COMPLETED RECENTLY:

WASTE WATER TREATMENT PLANT PTUJ

We carried out at the plant the installation of mechanical and technological equipment, and installation of pipelines.
Sequential biological treatment plant capacity of 68,000 PE (population equivalents) with aerobic stabilization of sludge with nitrification and denitrification and phosphorus chemical purification technology includes the following sub- facilities:
  • mechanical cleaning (pumping the input reliever, trap rocks, coarse and fine electric motor rakes, ventilated and grit removal tanks and grease trap assembly shaft fat);
  • biological treatment (pool distribution, sequential wells, compressor station);
  • chemical treatment (precipitation of phosphorus);
  • Treatment of sewage sludge (thickener and sludge hopper, a facility for a wastewater treatment plant sludge from small, machine-concentration of sludge, sludge drying);
  • Ancillary structures (transformer station, laboratory, administration building, electrical generator set, boiler rooms, storage rooms).

WASTE WATER TREATMENT PLANT KASAZE

We carried out at the plant the erection of pipelines.
It is an upgrade of existing plant to 60,000 PE (population units). Technological plant with anaerobic stabilization of sludge is composed of 23 technological facilities in 2 or 3 basic units: water line, a line of mud, the gas line.

WASTE WATER TREATMENT PLANT RAZKRIŽJE

We carried out the installation of mechanical and technological equipment, and piping erection.
It is a mechanical-biological treatment plant capacity of 2000 PE (population equivalents), which comprises the following technological subunits:
  • Mechanical cleaning - inlet rakes (Fine filter, grit removal tanks);
  • Cesspit;
  • biological treatment (sequential pool, a compressor station);
  • Treatment of sewage sludge (sludge hopper, a place with decanters to feed flocculants);
  • administrative building

CREAMERY CELEIA, Arja vas

1. PARTIAL SUPPLY AND ASSEMBLING OF PIPELINES, HARDWARE EQIPMENT AND MATERIAL ON WASTE WATER CLEANING PLANT
  • Assembling the containers and landings made of enameled sheet metal
  • Supplying and assembling the material and equipment-changing the engine room on water cleaning plant
  • Supplying and assembling the material and equipment for connection between the pump station and cleaning station
  • Assembling the pipelines on waste water plant

WASTE WATER TREATMENT PLANT PIGFARM, Podgrad

1. MECHANICAL WORKS OF THE RECONSTRUCTION AND COMPLETION WASTE WATER TREATMENT PLANT
  • Assembling the container made out of enameled sheet metal
  • Assemlbing the hardweare
  • Supply and accomplishment of pipelines

WASTEWATER TREATMENT PLANT LAŠKO

1. Communal phase:
  • supply and erection of pipelines and valves and erection of mechanical equipment

2. Industrial—biological phase:
  • detailed engineering design, supply and erection of »Biobed Reactor« and conditioning tank

WASTE WATER TREATMENT PLANT CELJE

Erection of mechanical and technological equipment and detailed engineering and erection of piping:
  • erection of mechanical equipment
  • detail engineering and erection of piping
  • final corrosion protection
  • facility start-up
  • documentation for taking over of the plant (as-build drawings,...)

WASTE WATER TREATMENT PLANT LEK LENDAVA

Supply and erection of mechanical installations and erection of mechanical equipment:
  • mechanical installation works (air conditioning, cooling, heating, water supply piping)
  • erection of technological equipment (piping, valves, pumps, jacks, gates, spillweirs, blowers, Noggerath equipment, …)
  • facility start-up
  • cooperation in project documentation preparation

WASTE WATER TREATMENT PLANT ŠALEŠKE DOLINE

Supply and erection of mechanical equipment Biofiltration for project Waste water treatment plant Saleške doline:
  • erection of mechanical equipment (blowers, pumps,...)
  • supply and erection of supports
  • dobava in montaža ostale opreme
  • erection of piping, valves and instruments

DEDUSTING FACILITY ACRONI, Jesenice

Supply and erection of equipment for suction of 4th opening of electric arc furnace:
  • fabrication , supply, erection and corrosion protection of ducts, dust collectors and support steel structures
  • erection of technological equipment (supplier: AAF)
  • supply and erection of steel parts of compensators

DESULPHURIZATION PLANT FOR THERMAL POWER PLANT TRBOVLJE

1. Erection of equipment in total weight of 1200 t for I. and II. phase of construction:
  • dismantling and erection of existing equipment (ducts, fans)
  • preassembly and erection of new gas ducts
  • erection of steel structure and façade support structure
  • erection of fans, flaps and compensators
  • elevators of limestone flour
  • heat exchangers, pumps

THERMAL POWER PLANT ŠOŠTANJ, DESULPHURIZATION PLANT

Dismantling of existing boiler 5 - 2 pieces:
  • casing of precipitator with all elements
  • steel construction EF
  • gas ducts and
  • fans

Erection of mechanical part of new electric percipitator - 2 pieces:
  • casing of precipitator with all elements
  • entrance and outlet cover
  • prefabrication of existing and erection of new supporting steel structure